click to show more information

click to hide/show information About your Search

20121201
20121231
SHOW
STATION
SFGTV2 1
DATE
LANGUAGE
Search Results 0 to 0 of about 1
to say. we're here -- we got the appeal from the dpw and we were asked to do some things. we distributed keys and went with the hours of operations and applied for the property building permits that the department of building inspection and went through planning. so we have got gone through the dpw, dbi approved the plans. we haven't quite got it all signed off because we were told to stop on it somewhere along the line when the dbi permit got approved. we did the load studies for the people coming and going and access and push bars and the keys. so it's pretty easy to walk in and out of the door, it works and it can be accessible, if it needs to be. i'm not sure how you would get a wheelchair in the building once it's in there, but it's not a problem. we have to do something with the grade there, but we haven't finished a lot of this stuff and somebody was talking about the structure. we haven't completed it because we were told to stop on it. which they are all pretty simple things to complete, the structure. i think it's a good thing for the building. it keeps them clean
Search Results 0 to 0 of about 1